Preparing Bathroom 2

27th April 2001

Back to the project diary


The walls in the bathroom are prepared for tiling. The shower unit has been tested and is finally boxed in. The walls in the "wet area" are then painted with a water-proof compound.



Copyright (c) 2000 - 2003 - L. F. Holgate