![]() |
Preparing Bathroom 1 3rd June 2001 |
The walls in the bathroom are prepared for tiling. The shower unit has been tested and is finally boxed in. The limestone around the bath is cut to size. Note the access panel for bath trap maintenance. The WC pan is fitted (and then removed again, of course...) and the walls in the "wet area" are painted with a water-proof compound.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Copyright (c) 2000 - 2003 - L. F. Holgate |