The electrical services are now complete.
These were the most exciting "electrical services" pictures I could come up with... The complicated wiring box deals with the lights in the main living area. The complexity is due to the switching requirements, and the fact that we may computer control the switching at a later date... Bottom left shows the central patch panel for the in house network... The wires still hanging are the TV signal distribution stuff, we have a 6 way signal booster/splitter to be installed yet. The octopus at the bottom right is the ventilation system for the bathrooms, it's located in the storage area above them.